Skip to product information
1 of 7

In-Pool Lounge Chair Ergonomic S-Curve HDPE Pool Chaise Lounger with Wheels-Brown

In-Pool Lounge Chair Ergonomic S-Curve HDPE Pool Chaise Lounger with Wheels-Brown

Regular price £109.99
Regular price Sale price £109.99
Sale Sold out
Taxes included. Shipping calculated at checkout.

Pay in easy instalments at 0% interest with Klarna


Estimated Delivery Date:
-


Shipping: Free (UK Mainland) 

Check for any applicable surcharge by adding to cart


Returns: Easy 30 day returns


Quantity

The built-in rear wheels make repositioning this patio lounge chair incredibly simple around your garden or pool, and the waterproof surface ensures low maintenance daily care. You can lye comfortably for hours since the ergonomic S-curve design beautifully mimics the natural human spine shape for full-body support. Crafted from weather-resistant HDPE, the poolside lounger endures harsh environmental elements without fading or cracking under intense daily sunlight. Moreover, this firm 21kg self-weighted sun shelf chair securely sits in waters between 14.5-22 cm deep, confidently supporting a weight capacity of up to a full 205kg. Outdoor Element Defense: This pool lounge chair, crafted from HDPE and 304 stainless steel hardware, is built to endure outdoor elements. It resists fading, peeling and cracking in intense sun exposure. Highly enduring by design, it is chlorine- and saltwater-friendly, ensuring lasting performance by the pool without rust. Stable Weighted Structure: The pool lounger weighs a solid 46.5 lbs, providing reliable self-weighted stability. It will stay in place without the hassle of filling heavy sandbags. Engineered for sun shelves and shallow pools with a recommended water depth between 14.5-22 cm, it offers a semi-submerged cooling comfort. Ergonomic Curve Support: Featuring an ergonomic S-curve profile, this in-pool chair beautifully mimics the natural human body shape for deep relaxation. This precise contouring delivers full-body support for your back, lumbar, and legs. It significantly minimizes fatigue, allowing you to sunbathe or read comfortably for hours. Reliable Weight Support: With a robust frame and widened structural beams, this pool chaise lounge boasts a weight capacity of up to 205kg. The spacious seating area easily accommodates multiple body types, providing a wobble-free lounging experience whether you relax in or out of the water. Easy Mobility Wheels: Equipped with 2 smooth-rolling rear wheels, moving this sun lounger around your deck, garden or out of the pool is effortless. Plus, the waterproof surface requires low maintenance, making daily cleaning easy. You just rinse it with a hose or wipe it down with a soft cloth to wash away dirt and splashes.

Specification

Color: Black/Brown Material: HDPE Overall Dimensions: 163 x 55 x 64 cm (L x W x H) Recommended Water Depth: 14.5-22 cm Net Weight: 21 kg Weight Capacity: 205 kg Package Includes 1 x In-Pool Lounge Chair 1 x User Manual Is Assembly Required: Yes Box QTY: 1(May vary by batch)

View full details